home *** CD-ROM | disk | FTP | other *** search
/ FEMA National Fire Acade…ulation: Casper Hall Dorm / FEMA National Fire Academy Simulation: Casper Hall Dorm.iso / prefire plan print.BMP (.png) < prev    next >
Bitmap Image  |  2000-03-02  |  1MB  |  975x1363  |  8-bit (150 colors)
Labels: text | screenshot | font | number | parallel | black and white | receipt
OCR: Quick Access Prefire Plan Building Address: 240 29th Street Building Description: 6-story/ordinary construction 75'x200' Two residential wings around a central core. Stairwell skylights with fusible links. Roof Construction: 1"x 6" joists with plywood sheathing and tar and gravel cover. Floor Construction: Beam and joist, 1"x 6" sheathing, hardwood floors Occupancy Type: Initial Resources Required: College Dormitory E8, E9, E10, T8, S1, A10, R8, B2 Hazards to Personnel: First floor storage locker Location of Water Supply: Available Flow: Hydrant, 8-inch municipal system. Hydrants 1200 - gpm per hydrant 300' apart east, west and north of fire building Estimated Fire Flow Level of Involvement 25% 50% 75% 100% Estimated Fire Flow 250 500 750 1000 *Fire flow based on common area (lobby and hallways) of 1,500 sq. ft. with 4 exposure floors. Fire Behavior Prediction: Rescue, confinement, ventilation Predicted Strategies: Rescue, confinement, extinguishment, ventilation, salvage Problems Anticipated: 60 students per occupied floor-3 students per room Standpipe: Sprinklers: X Fire Detection: